Cost-Smart Solution
Efficient regranulates focused on cost savings without lowering your minimum quality standards.
For applications where top-tier specs aren’t required, our Cost-Smart Solution keeps production moving efficiently and economically. These grades are engineered for functionality, helping you maximize output per euro spent.
Perfect for production of:
Thick garbage bags
Construction films
Protective covers
Tarpaulins
Ground sheets
Low-spec extrusion items
Why choose our Cost-Smart line?
Best Price-to-Performance Ratio: Designed for applications with wide tolerances.
Consistent quality: Homogenized batches keeping the quality on the line.
Basic QC Checks: Visual control and lab extruding to ensure reliable, problem-free processing.
Included Services
ISO 9001 / 14001 & RecyClass Certified: Even our most economical grades meet certified quality standards.
Trial Lots: Free 25 kg sample to test on your own line
Simple Logistics: Bulk big-bag shipments optimized for cost-effective transport.
Cost-Smart Line-Up & Typical Uses
r-LDPE Colormix (economy grade): Garbage bags, construction sheets and ground covers, extrusion of thick non-critical parts.
➡ When quality is critical and downtime is not an option, step up to our Premium Solution.
Test It Before You Trust It
We’ll send you a free trial sample to test in your own machines. No guesswork. Just results.
Get Free Samples
Frequently Asked
Questions
Explore our FAQs to discover how we
power your drive with speed, smarts, and
sustainability. Find the spark to your
questions below!
We ship in big bags on pallets — approx. 1.100 kg each, size 1,2 × 1,2 × 2,2 m. If you need outdoor storage, we can add a protective cover and stretch wrap – just tell us.
Absolutely. Every big bag is inspected before homogenising, and the final batch undergoes another round of tests — visual check, film sample, MFI measurement. All under our ISO-certified quality control system.
We can usually deliver a sample within 48 hours, typically in 2–3 days. Exact timing depends on sample size and the destination country.
We usually deliver full truckloads (23.5 t) due to shipping costs. Smaller quantities are possible upon agreement, with a minimum of 5 tons.
If the material is in stock, delivery can be arranged within a few days. Otherwise, lead time depends on available production capacity — usually up to 14 days. Our production and logistics run on monthly planning, with a focus on long-term partnerships.
To some extent, we can select the desired color and material properties, but as this is recycled material, values will always be within a certain tolerance range.
No, our materials are not intended for the production of films for food contact.
- New customers: 100% prepayment for 1st delivery.
- Regular partners: 14–30 days payment terms (upon approval by Euler Hermes) or as agreed.
Contact us within 24 hours of delivery. Our QC team will arrange sample pickup and propose an immediate solution.